AI Data Center Power Calculator
Translate server or GPU assumptions into IT load, facility demand and an energy scenario. Full-system power and chip-only power are different inputs.
AI Data Center Power Calculator
Calculations run in your browser. Sharing puts numeric assumptions in the link. No registration required.
Formula
Worked example
100 complete systems at 10,000 W, plus 100 kW of other IT, give 1,100 kW IT and 1,375 kW facility demand at a planning PUE of 1.25.
What this calculation does not cover
GPU-only mode requires you to include CPUs, memory, networking, storage and conversion overhead in “additional IT”. Electrical load fraction is not GPU compute utilization. A planning PUE is a scenario input, not a measured annual PUE.
Sources & further reading
Using the result responsibly
Keep a record of the input units and operating assumptions. A change in one input can make two apparently similar equipment options impossible to compare. Export the scenario before reviewing it with your engineer or equipment manufacturer.